LATEST UPDATESEnglish
AAARYO NewsA curated stream of attributed news links
Stay close to the storiesA clear view of source-attributed news headlines.
World

Elevator problems at NRCan office tower leading to 'disabling injuries' amid RTO

Problems with the elevators at a Natural Resources Canada building in Ottawa got so bad that they caused injuries to public servants on more than one occasion last summer, according to internal documents. The elevator issues at 580 Booth St. have left two publ

Illustrative imageIllustrative image

Problems with the elevators at a Natural Resources Canada building in Ottawa got so bad that they caused injuries to public servants on more than one occasion last summer, according to internal documents.

The elevator issues at 580 Booth St. have left two public servants suffering a "disabling injury," according to the documents, which detailed incidents related to the elevators. The injuries occurred when an elevator suddenly and quickly dropped.

In one incident in June, an employee even "sought medical attention and lost time at work," said the documents, which were shared with the Ottawa Citizen.

The Ottawa Citizen previously reported plans are underway to replace the aging elevators between summer 2027 and September 2028. But in the meantime, problems at the elevators, which stretched back to at least February, have persisted this past summer, as most public servants returned to the office for four days a week.

The 21-storey office tower, known as the Sir William Logan Building, has faced "on-going elevator disruptions," which have been "source of concern and frustration for employees," according to a previously reported internal email obtained by the Ottawa Citizen.

The issues have gotten so bad that public servants have been stuck in the elevators on several occasions. In one incident this summer, public servants were stuck in an elevator for about 20 minutes.

In the June incident, the employee got on the elevator on the 16th floor to go down, according to the documents. At about the 12th floor, the elevator started to drop "suddenly and very quickly" and after three seconds stopped at the basement. The elevator eventually rose up to the ground floor.

In July, an elevator with nine employees "made clunking noises" as it went up to the 12th floor, but then "suddenly dropped" for two seconds before it "jolted to a stop," according to documents. The public servants pushed the emergency button after the doors wouldn't open. The elevator then rose to the 12th floor, where everyone got off quickly.

"A few people were crying and nearly all were terrified," the documents said. The incident led to a "sprain" as well as "strains."

Other documented incidents included a "near miss" in which elevator occupants heard "sharp metal scrapes and clangs" before it "shuddered violently" and "dropped abruptly an unknown distance" before stopping. It led to "psychological injury," according to the internal documents.

In another incident in July, an employee was stuck in an elevator for more than 90 minutes, the documents said.

When asked about the injuries, Natural Resources Canada spokesperson Marie Martin said in an emailed statement that the "health, safety and well-being of employees is a top priority" for the department.

"Elevators in federal buildings, including at 580 Booth Street, are subject to strict regulatory requirements, including regular inspections, maintenance and a valid certificate of safe operation. Public Services and Procurement Canada (PSPC), as building custodian, has confirmed that the elevators at 580 Booth Street meet all applicable safety requirements," Martin said.

Martin said that the department cannot comment on "individual employee situations" due to privacy reasons.

Inside the building, which built in 1974, there are eight elevators. Four of them take employees halfway up the building to the 12th floor, and the other four bring public servants to the top floors.

Take control of your search results. Make the Ottawa Citizen a preferred source on Google and see verified local reporting first.